Temporary two-way traffic signals will be in operation on Chapel Lane, Bingham, approximately 200 meters south of its junction with Moorbridge Road, from 8:00 AM to 5:30 PM on Monday, 2nd September 2024. These signals will be manually controlled at all times to ensure smooth traffic flow while BT installs a new telecom pole. For more information, please refer to the attached document.